Washington Community High School Addition and Renovations Washington, IL

PAST PERFORMANCE


 















Washington Community High School Summer 2011 Renovations

This project consisted of the renovation of various existing spaces throughout the high school over the Summer of 2011 in advance of a significant building addition in the Fall of 2011. Work for this project coincided with a separate asbestos abatement project over a fifty five day period in the Summer of 2011 and was coordinated through P.J. Hoerr as the Construction Manager to ensure all work was completed on schedule before the start of school in late August. Work in the 1955 East addition included installation of new aluminum storefront window systems, suspended ceiling installation and VCT floor tile installation, as well as installation of light fixtures and plumbing fixtures. Also included in that portion of the building was painting and patching of existing walls where required.  The 1955 South Addition included renovation of the Family and Consumer Sciences department including suspended ceiling installation, VCT floor tile installation, light fixture and plumbing fixture installation, removal and replacement of existing casework, and expansion of the air conditioning system. Work also included total building demolition of a portion of the 1955 East addition (in advance of the planned building addition) and installation of temporary weather tight enclosures at the resulting openings and along the face of the exposed block wall. Relocation of building systems, including power, data and electrical serving the Ashbrook building was also a portion of the project.

Client:                           Washington CHSD #308 
Architect:                      BLDD Architects, Inc.
Delivery Method:
           Agency Construction Management
Construction Type:
       Renovation and Remodel
Completion Date:
           August 2011
Building usage:
             Secondary Education
Building size:
                240,000 sq ft existing building
Project Supt:
                Mark Buchanan
Project Manager:
           Brian Faulkner, AIA, LEED AP
Project Executive:
         Kirk Anderson, Vice President



Washington Community High School Addition and Renovation  

This project consisted of the construction of a 30,000 sq ft addition which houses a multipurpose commons, kitchen and servery, administrative office suite, concession stand, main entry and connecting corridors housing various stair, elevator and ramp systems. This addition included a forced air heating and cooling system, plumbing and electrical work at the addition and connecting existing buildings. Renovation of classroom spaces to create nine expanded science labs, as well as various renovations in other portion of the building which included ceiling and floor work, wall finishes, installation of a platform lift and partition demolition/erection. In addition to this work there were various mechanical, plumbing, power, lighting and data upgrades. The project included related site work and a front drop off and parking area with concrete curbs, stairs and sidewalks, as well as storm sewer and detention basin work.

Client:                            Washington CHSD #308
Architect:                       BLDD Architects, Inc.
Delivery Method:
            Agency Construction Management

Construction Type:
        Addition and Renovation/Remodel
Completion Date:
            August 2012

Building usage:               
Secondary Education
Building size:
                 240,000 sq ft existing building and
                                       30,000 sq ft addition

Project Supt:
                  Mark Buchanan
Project Manager:
             Brian Faulkner, AIA, LEED AP
Project Executive:
           Kirk Anderson, Vice President




















 