As a way to show a different perspective of work being done here at P.J. Hoerr and Summit Masonry, I will from time to time feature a montage of photos taken in the field by either the Project Manager or Project Superintendent running a particular job.
Clinton Elementary School - Summit Masonry - Clinton, IL
First United Methodist Church - Peoria, IL
LA Fitness - Bloomington, IL
P.J. Hoerr, Inc. stands as one of Central Illinois’ premier General Contractors, Construction Managers and Design/Builders. Founded in 1914 by Philipp J. Hoerr as a concrete construction company, our stamp can still be seen on many area driveways and sidewalks. Now into our 105th year of operations P.J. Hoerr, Inc. has become a diverse, multi-office commercial builder.
CONSTRUCTING WITH CREATIVITY FOR 105 YEARS!
Visit P.J. Hoerr's Flickr Photostream | Click on any photo
Visit P.J. Hoerr's Flickr Photostream | Click here
From Flickr site browse our Photostream or click on Albums to browse by category
From Flickr site browse our Photostream or click on Albums to browse by category
Visit P.J. Hoerr, Inc.'s Flickr Photostream | Click on any photo
Wednesday, August 28, 2013
Illinois CancerCare - Peoria, IL
This 22,000 sq ft expansion of Illinois CancerCare is now underway. The current facility is located in north Peoria on Route 91. The project will include expanded research facilities and administrative offices, as well as renovations to a large portion of the existing structure. This additional operating space will expedite diagnosis and treatment of patients. The current entrance will also be widened for easier patient access.
Friday, August 23, 2013
Roanoke-Benson CUSD #60 - High School - Sowers Elementary School Connection - Roanoke, IL
Today at this addition to Roanoke High School, steel erectors were onsite. Also Summit Masonry was constructing an elevator shaft and stairwell.
P.J. Hoerr, Summit Masonry and Farmer's Insurance Golf Outing to Benefit the March of Dimes
The March of Dimes is a national voluntary health agency whose mission is to improve the health of babies by preventing birth defects, premature birth and infant mortality. Founded in 1938, the March of Dimes funds programs of research, community services, education, and advocacy to save babies and in 2003 launched a campaign to address the increasing rate of premature birth.
For more information, visit the March of Dimes Website at marchofdimes.com or it's Spanish language Website at nacersano.org
P.J. Hoerr and Summit feel privileged and honored to be able to host this magnificent event each year and are grateful to all who turned out to support it.
Wednesday, August 21, 2013
Jim Sharav
We
at P.J. Hoerr, Inc. mourn the loss of one of our most longstanding, loyal
and dedicated team members, Jim Sharav. In his 20 years with our company
Jim truly epitomized the essence of professionalism and class in all that he
did. He was not just an employee, peer and colleague… he was a
friend. Although his retirement years and life were cut far too short
those who knew him can rest in the knowledge that he filled that unfinished life
with days, months and years of commitment to community and others as well as an
unbridled passion for life. Rest eternally in the arms and peace of God
Jim. You will be missed.
Tuesday, August 20, 2013
P.J. Hoerr Flickr Photostream
As a way to display more photos taken at P.J. Hoerr, Summit Masonry and Benchmark Cabinets projects outside of what we post on our blog, we now have a Flickr Photostream link added to our blog (see link on right side of blog). From our Flickr site, click on either Photostream which is an overview of all photos or click on Sets which organizes these photos according to the type of construction.
Get there now by clicking link below:
Washington Community High School Addition and Renovations Washington, IL
Client: Washington CHSD #308
Architect: BLDD Architects, Inc.
Delivery Method: Agency Construction Management
Construction Type: Renovation and Remodel
Completion Date: August 2011
Building usage: Secondary Education
Building size: 240,000 sq ft existing building
Project Supt: Mark Buchanan
Project Manager: Brian Faulkner, AIA, LEED AP
Project Executive: Kirk Anderson, Vice President
Washington Community High School Addition and Renovation
This project consisted of the construction of a 30,000 sq ft addition which houses a multipurpose commons, kitchen and servery, administrative office suite, concession stand, main entry and connecting corridors housing various stair, elevator and ramp systems. This addition included a forced air heating and cooling system, plumbing and electrical work at the addition and connecting existing buildings. Renovation of classroom spaces to create nine expanded science labs, as well as various renovations in other portion of the building which included ceiling and floor work, wall finishes, installation of a platform lift and partition demolition/erection. In addition to this work there were various mechanical, plumbing, power, lighting and data upgrades. The project included related site work and a front drop off and parking area with concrete curbs, stairs and sidewalks, as well as storm sewer and detention basin work.
Client: Washington CHSD #308
Architect: BLDD Architects, Inc.
Delivery Method: Agency Construction Management
Construction Type: Addition and Renovation/Remodel
Completion Date: August 2012
Building usage: Secondary Education
Building size: 240,000 sq ft existing building and
30,000 sq ft addition
Project Supt: Mark Buchanan
Project Manager: Brian Faulkner, AIA, LEED AP
Project Executive: Kirk Anderson, Vice President
Subscribe to:
Posts (Atom)
WELCOME TO ALL THINGS P.J. HOERR, INC.