Senior Project Manager/Licensed Architect

From 1996 to 2000, Mr. Faulkner served as an architectural design professional for BLDD Architects, Inc. as a job captain, specifications writer, estimator, and CAD draftsman/project detailer for numerous educational, institutional, commercial, and church projects.  After receiving dual masters degrees in architecture and civil engineering/construction management in 2002 from the University of Illinois, Mr. Faulkner rejoined BLDD Architects as a licensed architect/project manager and managed the documentation, bidding, and construction administration of several facilities in the Decatur area.

Since joining PJ Hoerr in 2004, Mr. Faulkner has acted as a project manager managing the construction of several of the company’s largest and most complex projects including educational facilities, medical office buildings, a large community center, several churches, and an outdoor public swimming facility.













Education
Bachelor of Science in Architectural Studies
(BSAS) University of Illinois, Urbana, Illinois, 1996

Master of Architecture in the Practice Option
(March) University of Illinois, Urbana, Illinois, 2002
 
Master of Science in Civil Engineering/
Construction Management (MSCE)
University of Illinois, Urbana, Illinois, 2002

Registrations
Licensed Architect in Illinois

Professional Credentials
Member of American Institute of Architects (AIA)
Leadership in Energy and Environmental Design Accredited Professional
(LEED AP) administered by the U.S. Green Building Council (USGBC)


Here are some of the recent projects Brian was a part of:

Washington CHSD #308 Health Life Safety Project 2010, Washington, IL –  
Project Manager for the extensive renovations and remodeling of large portions of the existing high school within the framework of required health and life safety improvements required by the State. 2010

Washington CHSD #308 Summer 2011 Renovations, Washington, IL –
Project Manager for Phase 2 of extensive renovations and remodeling of large portions of the existing high school in advance of a significant building addition on the Washington High School Campus. 2011

Washington CHSD #308 Addition and Renovations, Washington, IL –
Project Manager for the construction of a 30,000 sf addition which houses a multipurpose commons, kitchen and servery, administrative office suite, concession stand, main entry and connecting corridors housing various stair, elevator and ramp systems.  Also includes Phase 3 of extensive renovations and remodeling of large portions of the existing high school. 2012

Washington CHSD #308 Gym Lighting Replacement, Washington, IL –
Project Manager for the removal and replacement of antiquated gym lighting and lighting control systems at two locations, (the West Gym and Torry Gym) on the Washington High School Campus. 2012

Washington CHSD #308 Voice and Backbone Cabling, Washington, IL –
Project Manager for the demolition of the existing fiber optic, copper distribution, and telephone cabling system for the Owner’s switchover to a VoIP (Voice-over-IP) communications system including new CAT-6 cabling, new multimode fiber optic, and small-count copper distribution cabling from the School’s centrally-located Data Center (MDF) to all of the School’s data closets (IDFs). 2012

Crossroads United Methodist Church, Washington, IL –  Project Manager for the construction of a $5.8 million 42,000 sq ft church building including a new 1,200 seat sanctuary, nursery rooms, a narthex, and classrooms. 2008

Richwoods Christian Church, Peoria, IL –
  Project Manager for a $2.3 million design/build remodel of an existing 30,000 sq ft retail space for religious use including a 500 seat sanctuary, children’s classrooms, adult classrooms, cafĂ©, lobby/common area, and offices. 2008

Washington Christian Church, Washington, IL –  Project Manager for a $1.5 million remodel of an existing church facility including new roof structure/roofing, remodel of the sanctuary, common space, and children’s classrooms, a kitchen addition, and new geothermal HVAC system. 2008

Washington Area Community Center (Five Points Washington), Washington, IL – Project Manager for the design/build construction of a $19 million 133,000 sq ft facility containing a library, fitness center, gym, indoor running track, aquatics center, banquet center, and auditorium complex. 2007

Graham Medical Group Clinic Building, Canton, IL
Project Manager for the construction of a $13.4 million four story, 70,000 sq ft medical office building consisting of office space, exam rooms, nurse stations, blood draw, waiting rooms, and an x-ray room. 2010

HeartCare Midwest, Peoria, IL – Project Manager for the design/build construction of a $13 million four story, 87,000 sq ft medical office building consisting of office space, exam rooms, testing clinic, catheterization lab, and chest x-ray spaces. 2005