PAST PERFORMANCE - This project is phase two of a three-phase master plan for the church. The original building is 33,000 square feet and was completed in 2001. This large addition is home to the church’s permanent 800-seat sanctuary space with a laminated wood truss and deck roof. The sanctuary has a large stone and wood altar wall with a wooden cross and stained glass window. The space is carpeted with fixed wooden pews with room to grow on the main floor and the balcony in a future construction phase that will increase seating to 1,100 seats. The facility also houses a nursery, classrooms, an entry/narthex space, toilet rooms, an elevator, storage rooms, and an audio/video/lighting control booth. The current construction includes shell space for future classrooms on the second floor and a choir room behind the sanctuary on the first floor. The current addition utilizes the existing parking lot with added parking planned for in the (future) third phase building additions.
P.J. Hoerr, Inc. stands as one of Central Illinois’ premier General Contractors, Construction Managers and Design/Builders. Founded in 1914 by Philipp J. Hoerr as a concrete construction company, our stamp can still be seen on many area driveways and sidewalks. Now into our 105th year of operations P.J. Hoerr, Inc. has become a diverse, multi-office commercial builder.
CONSTRUCTING WITH CREATIVITY FOR 105 YEARS!
Visit P.J. Hoerr's Flickr Photostream | Click on any photo
Visit P.J. Hoerr's Flickr Photostream | Click here
From Flickr site browse our Photostream or click on Albums to browse by category
From Flickr site browse our Photostream or click on Albums to browse by category
Visit P.J. Hoerr, Inc.'s Flickr Photostream | Click on any photo
Tuesday, September 25, 2012
Friday, September 21, 2012
Constructing with Creativity - Round II
From
time to time, we will feature a photo montage of our laborers,
carpenters, foremen, superintendents, masons, ironworkers & concrete finishers
working at various job sites. In addition to our stand alone project
postings, this is another way to showcase the variety of projects and
skills we perform on a daily basis here at P.J. Hoerr.
Thursday, September 20, 2012
Richwoods Christian Church - Peoria, IL
PAST PERFORMANCE - This project was a complete interior demo and remodel of the 30,000 square foot existing Leath Furniture building in Peoria, Illinois. This remodeled building became the new home to Richwoods Christian Church and included as its centerpiece a 600 person sanctuary space complete with an elevated stage, a large baptismal, a state of the art sound system, a full production video system with projection video screens, and a diverse stage lighting system. Also included in the building are the religious service support spaces including nursery rooms, children’s ministry classrooms, youth ministry classrooms, adult meeting rooms, a staff office suite, a backstage green room/toilets area, an entry/lobby/café area with a warming kitchen, and a communal library/resource area.
Wednesday, September 19, 2012
Phil Watkins - Quality Control Specialist
Mr. Watkins has been employed in the construction industry for 35 years. During this time he has served as a masonry field superintendent on many projects. He has worked closely with several forensic architectural design firms in the development of construction details in regards to exterior building envelopes and interfaces of building components. He now serves as a quality control specialist and is responsible for any leaks through the exterior building envelope including flashings, window systems, and building component interfaces. Since joining Summit Masonry & P.J. Hoerr in 1999 Mr. Watkins has acted as field superintendent, project manager, and quality control specialist. Projects he has been involved in include churches, medical office buildings, hospitals, nursing homes, schools and community centers. It is currently Phil’s job to review plans for problem areas, recommend solutions, inspect the work as it proceeds in the field and test buildings for water tightness and energy leakage.
Graham Medical Group Clinic - Canton, IL
After completing several other successful projects for the hospital, P.J. Hoerr was chosen to consult on the design and provide construction management for the project. After the value engineering discussed above, P.J. Hoerr provided the Owner with a guaranteed maximum price and proceeded to construction. The value engineering process reduced total project costs by $1.3 million (9%). P.J. Hoerr also advised the design team on the mechanical systems and site planning. Once the design was complete, P.J. Hoerr advertised for and bid the project.
Subscribe to:
Posts (Atom)
WELCOME TO ALL THINGS P.J. HOERR, INC.


