Above ceiling rough in’s
Interior framing
Hanging drywall
Interior finishing
Interior painting
MEP rough in’s
MEP insulation
Pulling electrical wire
Pool mechanical rough in’s
Exterior metal panel siding installation
MRI room rough in’s
Aluminum storefront installation
Casework installation
Tile
Carpet starting Monday
Also students from a construction sequencing class at ISU went on a tour of the facility with Project Manager Max Dirker and Project Engineer Mike Van De Veer.
No comments:
Post a Comment
Thanks for commenting on pjhoerr.blogspot.com