Our Savior Lutheran Church - Washington, IL

Today found framing underway as well as installation of siding.

RLI Insurance - Peoria, IL

P.J. Hoerr recently competed against the top construction management firms in Central Illinois and is thrilled to have been chosen to be part of the team that will design and construct an exciting new project for RLI Insurance. RLI is a Fortune 500 company celebrating their 50th anniversary this year. The North Peoria project will greatly expand RLI’s present facilities and create a campus environment to help them compete through the next 50 years.

Link to Central Illinois Perspective article 



Friday, March 27, 2015

P.J. "Hair" Day

This morning Jessica and Crystal from East Peoria's The Loft Salon and Spa stopped in the Peoria office to give free haircuts.

Thursday, March 26, 2015

Eastview Christian Church | Remodeling - Normal, IL

This remodel of the original gym is moving along nicely. The stage extension is framed up, columns have drywall up, the upper level concrete floor has been stained and polished and the lower level floor will get the same treatment starting today.

P.J. Hoerr & Summit Masonry Weekly Toolbox Talk | Hand Tool Safety 2015

This week's Toolbox Talk.

These posts will be archived in the Blog Categories under Toolbox Talks on the right side of the blog.

Thursday, March 19, 2015

Advocate BroMenn Regional Medical Center | Pharmacy Relocation - Normal, IL

Today found sections of the floor poured and framing just getting started. I also talked to Project Superintendent Brad Poindexter about this project.


Advocate BroMenn Regional Medical Center | Lab Relocation - Normal, IL

PAST PERFORMANCE - In order to upgrade their facility, incorporate state-of-the-art equipment and increase the amount of testing that can be performed for remote clients, Advocate BroMenn decided to relocate their existing medical laboratories to a new and larger location in the lower level of their new Patient Tower. P.J. Hoerr was involved from the beginning of design development to prepare cost estimates, explore design alternatives and assist in the design process.

P.J. Hoerr also incorporated Building Information Modeling (BIM) into the construction process to coordinate very dense mechanical and electrical systems. P.J. Hoerr managed the BIM process, performed “Clash Detection” and coordinated the resolution of the final mechanical layout.

Wednesday, March 18, 2015

P.J. Hoerr & Summit Masonry Weekly Toolbox Talk | Caught Between Hazards 2015

This week's Toolbox Talk.

These posts will be archived in the Blog Categories under Toolbox Talks on the right side of the blog.

Buehler Home Apartment Addition - Peoria, IL

Work is underway at this 7,000 sq ft 3-story addition to Buehler Home. Today Summit Masonry was laying block for the stair tower and digging/pouring footings have started.