Wednesday, November 5, 2014

OSF St. Mary Medical Center | Intensive Care Unit Redesign & Expansion - Galesburg, IL

Today found the 3rd floor electrical code correction, fireproofing, under floor plumbing for ICU on the 4th floor, new ceiling, lighting and central fetal monitoring all completed.


On the 4th floor steel framing, mechanical work and wood blocking for the window frames and walls were underway.


Behind the hospital in the boiler facility demo was done to bring in a new boiler. Plumbing was run and an expanded concrete pad was installed to accommodate the new boiler. Upstairs Summit Masonry demoed and built back a section of the wall to allow for a new air intake louver. Also a sidewalk will be poured just outside the rear emergency exit of the boiler facility.