The east end addition will consist of 3,650 sq ft on the lower level and 3,650 sq ft on the upper level. This space will serve as children's worship areas and classrooms. The exterior will be stone veneer, EIFS (Exterior Insulation and Finishing System), split face CMU (Concrete Masonry Units) and storefront system. Today found the upper level floor poured and grading of the lower level underway for a pour tomorrow.
The west end addition will consist of 24,350 sq ft, including a gymnasium, restrooms, and circulation space. The exterior will be precast concrete panels, split face CMU (Concrete Masonry Units) and storefront systems.
Pre-cast panels going up for gymnasium
Project Manager Jeff Trower (left) and Project Superintendent Pat Nance (right) |