Monday, March 31, 2014

Friday, March 28, 2014

OSF St. Joseph Medical Center - Bloomington, IL

PAST PERFORMANCE - To document the latest completed projects within the hospital and surrounding OSF clinics I took a photo tour with Project Superintendent Kevin VanDusen.

OSF Chiller Addition – General Contractor


OSF SJMC Birthing Center Addition – PJH completed the casework and
finishes portion of this building addition for separate construction manager.


 
OSF SJMC C-Section Addition – PJH was the construction manager to this addition to the existing birthing center. This project consisted of the build-out of a shelled room inside of the fully functioning C-Section suite. Thus detailed temporary barriers and infection control was required to maintain existing services at all times.


OSF SJMC OR Booms Replacement and Room Finishes – PJH was the construction manager for this renovation to each of the five existing OR rooms. This renovation consisted of the replacement of existing ceiling mounted equipment booms and upgrading the finishes.  Also included was new medical gas and electrical power required to supply the booms.


OSF SJMC Central Plant Upgrades Generator Replacement – PJH is the construction manager for this upgrade project to the existing facility generator building. Currently, prep work is being done to change out an existing generator with a new upsized generator. A temporary generator has been utilized to provide temporary power while the work is completed. A late spring 2014 completion date is scheduled.


OSF SJMC Sleep Lab MOB – PJH was selected as the design/builder of this medical office building located at 2411 E. Washington St. This project is being completed on an extremely fast-track schedule. The total project duration, including the design phase, is just 10 weeks. Occupancy is scheduled for the first week of April. This project will house six sleep monitor rooms, control room and all related functions to create a fully functioning sleep lab.


OSF SJMC Internal Medicine at College Avenue Exam Rooms – PJH was the construction manager for this renovation project to add six new exam rooms to the existing Internal Medicine practice. This renovation was completed to maintain constant function of the existing practice.


 
OSF SJMC Audiology Relocation at College Avenue – PJH was the construction manager for this renovation that relocated the Audiology practice within an existing medical office building. This project consisted of new exam rooms, a new sound booth and
supporting functions.