Today at this project a crane was brought in to pickup and place two control
units into the 3rd and 4th floor of the DuPont BG
Tower. Prior to the lift being completed the P.J. Hoerr crew met with DuPont to
review the lift plan to ensure a safe and productive lift. Setting of the
control unit required two cranes lifting in tandem to bring it up to the floor
height. Once there the front of the control unit was placed on air skates
and pulled into the building while the second crane held the control unit in
place.
Ironworkers on this project: Ed Eden, Bill Hart, Joe Riesing, Shannon Hair, Jim Rients, Doug Deakin
Ironworkers on this project: Ed Eden, Bill Hart, Joe Riesing, Shannon Hair, Jim Rients, Doug Deakin
Here is a brief overview of work being done at this facility:
Fill in existing penetrations on all floors with steel and concrete.
Demo and replace 1st floor concrete
Fill in existing penetrations on all floors with steel and concrete.
Demo and replace 1st floor concrete
Misc. Demo throughout
New steel bracing throughout the
building
New stair towers
New dock
Steel platforms for equipment
Set equipment