OSF St. Mary Medical Center | Intensive Care Unit Redesign & Expansion - Galesburg, IL

OSF St. Mary Medical Center held a wall breaking ceremony as this redesign and expansion of their Intensive Care Unit floor begins. Also took some photos of the space before construction begins.


Thursday, April 17, 2014

Knox College Alumni Hall Renovation - Galesburg, IL

Today found a majority of the floors poured. Metal studs were being installed and Summit Masonry was patching or replacing brick throughout the building.


P.J. Hoerr & Summit Masonry Weekly Toolbox Talk | Scaffold Safety - Fabricated Frame Scaffolds

This week's Toolbox Talk.

These posts will be archived in the Blog Categories under Toolbox Talks on the right side of the blog.


Monday, April 14, 2014

Apostolic Christian Home for the Handicapped, Inc. - Morton, IL

PAST PERFORMANCE - At the Apostolic Christian Home at Oakwood Estates, a complete remodel of both resident wings and the central living area is completed. 

The floor plan in the resident wings has completely changed by adding more spacious rooms and closets, larger windows, a six foot wide hallway, extra wide doors and architectural casing at all doors and windows. The central living area has been updated
to give more space in the living room and added office space. The new flooring throughout provides ease of mobility with no transitions between flooring materials. The new tiled bathrooms and showers now have total access for the residents.



Friday, April 11, 2014

Washington Area Community Center | North Addition - Washington, IL

PAST PERFORMANCE - The Washington Area Community Center held their ribbon cutting ceremony for their new 10,000 square foot group fitness class addition to Five Points Washington. This project added a two-story structure of four classrooms to the north side of the current gymnasium and walking track. Project Executive - Paul Bright | Project Manager - Blake Kinsman | Project Superintendent - Josh Rodriguez