This week's Toolbox Talk.
These posts will be archived in the Blog Categories under Toolbox Talks on the right side of the blog.
P.J. Hoerr, Inc. stands as one of Central Illinois’ premier General Contractors, Construction Managers and Design/Builders. Founded in 1914 by Philipp J. Hoerr as a concrete construction company, our stamp can still be seen on many area driveways and sidewalks. Now into our 105th year of operations P.J. Hoerr, Inc. has become a diverse, multi-office commercial builder.
CONSTRUCTING WITH CREATIVITY FOR 105 YEARS!
Visit P.J. Hoerr's Flickr Photostream | Click on any photo
Visit P.J. Hoerr's Flickr Photostream | Click here
From Flickr site browse our Photostream or click on Albums to browse by category
From Flickr site browse our Photostream or click on Albums to browse by category
Visit P.J. Hoerr, Inc.'s Flickr Photostream | Click on any photo
Thursday, February 13, 2014
Wednesday, February 12, 2014
Washington Area Community Center | North Addition - Washington, IL
Steady progress continues at this two-story addition for Five Points Washington. All of the floors have been poured and stairs are installed. Also underway are metal stud framing, HVAC, fireproofing, plumbing and electrical.
Project Superintendent Josh Rodriguez
![]() |
| Demo of existing stairwell Should point out there is a safety barrier behind that door |
| The existing walking track at Washington Area Community Center that P.J. Hoerr completed in 2007 |
Roanoke-Benson CUSD #60 - High School - Sowers Elementary School Connection - Roanoke, IL
This 27,000 square foot addition to Roanoke-Benson School District 60 will provide RBHS with
a safe and secure main entrance, along with modernized science labs and classrooms. The new facility will also have a centralized administration area
for controlled access of visitors to the site, a centrally located 21st century
library, and a lunch room for RBHS students.
Here are some in progress photos - more to come
Thanks to BLDD Architects for providing these photos
Thanks to BLDD Architects for providing these photos
Thursday, February 6, 2014
P.J. Hoerr & Summit Masonry Weekly Toolbox Talk | Equipment Operation
This week's Toolbox Talk.
These posts will be archived in the Blog Categories under Toolbox Talks on the right side of the blog.
These posts will be archived in the Blog Categories under Toolbox Talks on the right side of the blog.
Wednesday, February 5, 2014
First United Methodist Church | Phase 3 - Peoria, IL
Phase 3 of this Peoria downtown church is underway. This 3rd phase is the mechanical, electrical, plumbing, and
architectural remodeling of the first and second floors of the existing
facility that houses the administrative offices, the children’s nursery area,
and the education classrooms for the church. The space that housed the relocated offices gets remodeled into a
gathering and fellowship space in between the existing traditional sanctuary
and the new contemporary worship center. The nursery and the classroom spaces receive updated electrical systems
and fresh architectural finishes.
Thanks to Project Superintendent Troy Wertz for providing these photos
Thanks to Project Superintendent Troy Wertz for providing these photos
Monday, February 3, 2014
Bob Lindsay Honda - New Construction | Renovation - Peoria, IL
Today found some steel erected for the new showroom. The service drive addition is enclosed and is being heated so a water proofing membrane and exterior brick and Dryvit can be installed. Scaffolding was also being constructed.