P.J. Hoerr & Summit Masonry Weekly Toolbox Talk | Emergency Response - Tornados and Severe Weather

This week's Toolbox Talk.

These posts will be archived in the Blog Categories under Toolbox Talks on the right side of the blog.


First United Methodist Church | Phase 3 - Peoria, IL

Phase 3 of this Peoria downtown church is moving along nicely. Steel studs and drywall are now being installed. Also painting and floor prep are underway.

Thanks to Project Superintendent Troy Wertz for providing these photos.

Tuesday, April 29, 2014

OSF Saint Francis Medical Center - MRI Suite - Peoria, IL

Arrived early this morning at OSF Saint Francis for delivery of the second MRI magnet.

Renovation of this 8,000 sq. ft. ground floor space was completed to accommodate two new MRI suites. Renovation included demolition of existing lead lined Cath Lab spaces including concrete floor slabs, new steel stud framing, drywall, radio-frequency shielding, upgrades to electrical, plumbing, HVAC and building automation systems, windows, doors and hardware, lighting, medical gas systems, plumbing, roofing, masonry repair, interior finishes and coordination with MRI vendor (GE). $1.9 million - Completion in June 2014

Project Superintendent Matt Caldwell | Project Manager - Andy Cook

Opening created for MRI delivery

First MRI Magnet delivered

Benchmark Cabinets and Millwork provided casework in these Suites

Space for second MRI Magnet

Copper lined walls

Monday, April 28, 2014

P.J. Hoerr & Summit Masonry Weekly Toolbox Talk | Site Layout - Underground Utility Locate

This week's Toolbox Talk.

These posts will be archived in the Blog Categories under Toolbox Talks on the right side of the blog.


Wednesday, April 23, 2014

Illinois CancerCare - Peoria, IL

This 22,000 sq ft expansion of Illinois CancerCare is nearing completion. Also some renovation of the PET/CT Scanning space is underway.



Bob Lindsay Honda - New Construction | Renovation - Peoria, IL

Today at this addition and renovation for Bob Lindsay Honda on Pioneer Parkway concrete was being poured for the rest of the showroom floor. Over at the service drive addition, ceiling grid is up along with painted walls and wood flooring being installed in the service write up space.