These posts will be archived in the Blog Categories under Toolbox Talks on the right side of the blog.
P.J. Hoerr, Inc. stands as one of Central Illinois’ premier General Contractors, Construction Managers and Design/Builders. Founded in 1914 by Philipp J. Hoerr as a concrete construction company, our stamp can still be seen on many area driveways and sidewalks. Now into our 105th year of operations P.J. Hoerr, Inc. has become a diverse, multi-office commercial builder.
CONSTRUCTING WITH CREATIVITY FOR 105 YEARS!
Visit P.J. Hoerr's Flickr Photostream | Click on any photo
Visit P.J. Hoerr's Flickr Photostream | Click here
From Flickr site browse our Photostream or click on Albums to browse by category
From Flickr site browse our Photostream or click on Albums to browse by category
Visit P.J. Hoerr, Inc.'s Flickr Photostream | Click on any photo
Thursday, January 30, 2014
P.J. Hoerr & Summit Masonry Weekly Toolbox Talk | Masonry Safety
Every week P.J .Hoerr's Director of Corporate Safety Hans
Hinrichsen emails out Toolbox Talks to the Office Project Managers and Field
Superintendents on a variety of safety concerns, procedures and other
pro-active ways to stay safe on the job site. Our company blog provides another
resource for our employees to review the material we are putting out as well as
other visitors to our blog.
These posts will be archived in the Blog Categories under Toolbox Talks on the right side of the blog.
These posts will be archived in the Blog Categories under Toolbox Talks on the right side of the blog.
Wednesday, January 29, 2014
DuPont Agricultural Products | BG Tower Renovations - El Paso, IL
Today at this project a crane was brought in to pickup and place two control
units into the 3rd and 4th floor of the DuPont BG
Tower. Prior to the lift being completed the P.J. Hoerr crew met with DuPont to
review the lift plan to ensure a safe and productive lift. Setting of the
control unit required two cranes lifting in tandem to bring it up to the floor
height. Once there the front of the control unit was placed on air skates
and pulled into the building while the second crane held the control unit in
place.
Ironworkers on this project: Ed Eden, Bill Hart, Joe Riesing, Shannon Hair, Jim Rients, Doug Deakin
Ironworkers on this project: Ed Eden, Bill Hart, Joe Riesing, Shannon Hair, Jim Rients, Doug Deakin
Here is a brief overview of work being done at this facility:
Fill in existing penetrations on all floors with steel and concrete.
Demo and replace 1st floor concrete
Fill in existing penetrations on all floors with steel and concrete.
Demo and replace 1st floor concrete
Misc. Demo throughout
New steel bracing throughout the
building
New stair towers
New dock
Steel platforms for equipment
Set equipment
Monday, January 27, 2014
OSF Prompt Care - Bloomington, IL
Looking at the archives of past projects, I found this OSF project that has not been posted to the blog, so here it is.
PAST PERFORMANCE - The Center For Health at Nord Farms fulfills the need for quality healthcare services for the SouthWest side of Bloomington/Normal. The 4,300 square foot facility provides patients with a no appointment, convenient and cost-effective alternative to the emergency room for non life-threatening conditions. The facility has X-ray capability and houses five Exam rooms, one Triage room, and one Outpatient Procedure Room.
PAST PERFORMANCE - The Center For Health at Nord Farms fulfills the need for quality healthcare services for the SouthWest side of Bloomington/Normal. The 4,300 square foot facility provides patients with a no appointment, convenient and cost-effective alternative to the emergency room for non life-threatening conditions. The facility has X-ray capability and houses five Exam rooms, one Triage room, and one Outpatient Procedure Room.
Mark Lawyer - Project Superintendent
Mark has 25 years
of experience in the construction industry. For the last 11 years, he has been a journeyman carpenter and
superintendent. Leading up to this, Mark
was an Engineer Assistant for 5 years for a post-frame building supplier in
agricultural, residential, and light commercial applications. He also worked
for 3 yrs with a large-volume residential home builder, where he drew and
designed house plans and was a customer consultant to complete projects. Lastly, for 6 years, he managed an R.P.
Lumber store with annual sales of over a million dollars and 8 to 12 employees.
With
this experience, Mark has a strong ability for scheduling and planning
projects, excellent customer and sub-contractor relationships, meeting budgets
and fulfilling expectations of projects and solving problems and issues in an economical and timely manner. Mark has become a complete Project Superintendent from
job site preparation and layout, foundations, structural and non-structural
framing, and adding the finishing touches to complete a project.
Certifications & Safety Training
First Aid and CPR Certified
OSHA 10 hours
OSHA Fall Protection
3M and Hilti, fire proofing applicator certified
Here are some of the recent projects Mark was a part of:
Community Cancer Center, Normal, IL - Project Superintendent for this 35,000 square foot addition to the Community Cancer Center in Normal, IL. This two-story addition will include new space for medical oncology, administrative and support areas and room for future growth. The smaller expansion includes radiation oncology, a conference center and waiting and exam rooms. There is also some interior renovation in progress. 2013-2014 - click project title to see past blog post
E-Court Plaza Improvements - Bloomington, IL - Project Superintendent for the upgrade to State Farm's executive entrance. Here is a summary of what was done; Excavation, Shoring, Structural Concrete, Pavement, Waterproofing, Backfill, (GFRC) Glass Fiber Reinforced Concrete Panels, Snow Melt System, Yard Drainage, Electrical Duct Bank, Landscaping, Lighting & Security Bollards. This was a unique project that required P.J. Hoerr to work two shifts to complete this work on time and on budget. 2012 - click project title to see past blog post
Crosspoint Community Church, Eureka, IL - Project Superintendent for this remodel. 2012
OSF Prompt Care at Nords Farm, Bloomington, IL - Project Superintendent for this prompt care that included an X-Ray lab, quality maple casework and trim, corian type countertops
and sills. 2007 - click project title to see past blog post
Illinois Wesleyan University, Bloomington, IL - Project Superintendent for this remodel of the University's Ballroom. 2006
Certifications & Safety Training
OSHA 10 hours
OSHA Fall Protection
3M and Hilti, fire proofing applicator certified
Here are some of the recent projects Mark was a part of:
Community Cancer Center, Normal, IL - Project Superintendent for this 35,000 square foot addition to the Community Cancer Center in Normal, IL. This two-story addition will include new space for medical oncology, administrative and support areas and room for future growth. The smaller expansion includes radiation oncology, a conference center and waiting and exam rooms. There is also some interior renovation in progress. 2013-2014 - click project title to see past blog post
E-Court Plaza Improvements - Bloomington, IL - Project Superintendent for the upgrade to State Farm's executive entrance. Here is a summary of what was done; Excavation, Shoring, Structural Concrete, Pavement, Waterproofing, Backfill, (GFRC) Glass Fiber Reinforced Concrete Panels, Snow Melt System, Yard Drainage, Electrical Duct Bank, Landscaping, Lighting & Security Bollards. This was a unique project that required P.J. Hoerr to work two shifts to complete this work on time and on budget. 2012 - click project title to see past blog post
Crosspoint Community Church, Eureka, IL - Project Superintendent for this remodel. 2012
IGA, Leroy, IL - Project Superintendent for this remodel of the Leroy IGA
(Independent Grocers Alliance) facility. 2011
(Independent Grocers Alliance) facility. 2011
Commerce Bank, Empire St,
Bloomington, IL - Project Superintendent for the remodel of this 2-story regional office building. 2010
LeRoy Replex, LeRoy, IL - Project Superintendent of this facility that included a gymnasium with 2nd story running track and
elevator, indoor lap pool, locker rooms, and an
outdoor family swimming facility. 2008-2009 - click project title to see past blog post
outdoor family swimming facility. 2008-2009 - click project title to see past blog post
Illinois Wesleyan University, Bloomington, IL - Project Superintendent for this remodel of the University's Ballroom. 2006
Saturday, January 25, 2014
Knox College Alumni Hall Renovation - Galesburg, IL
Steel shoring towers are now in place to support the roof as floors are taken out and scissor trusses are replaced or repaired. Summit Masonry is also continuing to demo and replace brick throughout the structure.
Subscribe to:
Posts (Atom)
WELCOME TO ALL THINGS P.J. HOERR, INC.